Construction Photographs

Executive Summary | Design Components | Budget/Funding

 Construction Photographs | Storm Events | Location | Summary Handout (pdf)

  FAQ | Standard Report | Performance | Research | Acknowledgements

 

Figure 1: View from Sheehan Hall of initial stages of excavation.

 

Figure 2: Looking into the Quad from Bartley Hall.  Contractors are beginning to excavate the lower infiltration bed.

 

Figure 3: Continued excavation of lower infiltration bed.  Chalk outline denotes perimeter of the bed.

 

Figure 4: The excavation of the central infiltration bed nearing completion.

 

Figure 5: Illustration of the infiltration beds with the #4 Baffle Stone in place.

 

Figure 6: Another view of the infiltration beds with the #4 Baffle Stone.

 

Figure 7: Notice the filter fabric separating the underlying soil from the stone.

 

Figure 8: Moisture meters after installation in soil wall just below base of infiltration bed.

 

Figure 9: Moisture meters at varying depths in soil wall.

 

Figure 10: A lysimeter prior to installation.

 

Figure 11: Layout of installed lysimeters at the base of the infiltration bed.

 

Figure 12: Final grading prior to the pouring of the pervious concrete.

 

Figure 13: First pour of pervious concrete.  A drum roller was used for compaction and finishing.

 

Figure 14: View of the first day’s pour.  Note the plastic covering on completed areas.

 

Figure 15: Second day of pouring.

 

Figure 16: Last day of pouring.  Reinforcement used for standard concrete.

 

Figure 17: Overhead view of completed project.

 

 